Rubbermaid P0-5L20-P0 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Non Rubbermaid P0-5L20-P0. Rubbermaid P0-5L20-P0 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 18
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
5L20
76 ¾"
51 ½"
55 ¼"
P0-5L20-P0
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides
proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important
that the steps are followed in the correct order).
Review the parts list and make sure that no parts
are missing.
IMPORTANT – DO NOT RETURN
TO THE STORE
For assistance with your Rubbermaid Storage Building
or for additional product information call our toll-free
Consumer Service number: 1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
or visit us online at: www.rubbermaid.com.
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
Vue de la page 0
1 2 3 4 5 6 ... 17 18

Résumé du contenu

Page 1 - Installation Steps:

5L2076 ¾"51 ½"55 ¼"P0-5L20-P0Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Servi

Page 2 - Required Tools

Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.Note: This pilot hole is to be drilled thro

Page 3 - Site Preparation

Snap Front Left Side (G) into Front Floor (A).d.21clickALIGNALIGNGInstall Wall Connector (Q) 5 places, connecting Repeat Left Side (C) and Front Left

Page 4 - Floor Installation

Align the lap joint between Front Right Side (H) andRepeat Right Side (E).c.HDrill a pilot hole (using 1/8" drill bit) in front lower corner at l

Page 5 - Wall Panel C Installation

4.0 Roof Panel M (back position) InstallationMRBInstall one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the

Page 6 - Wall Panel D Installation

From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at e

Page 7 - Wall Panel E Installation

4.2 Roof Panel J (front position) & Door InstallationInstall one Front Roof (J) onto front section: roof gable edge toward front of shed.Align to

Page 8 - Wall Panel F Installation

From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at e

Page 9

5.0 Finishing InstallationInstall Screws (AA) into 8 locations shown at bottom of wall panels to secure walls to floor. a.AA (8)HELPFUL HINT: Pilot

Page 10 - Wall Panel G Installation

Printed in U.S.A.2010 Rubbermaid Incorporated, Huntersville, NC U.S.A. 28078-1801 Customer ServiceToll Free: 1-888-895-2110M–F 8:30 a.m. to 5 p.m. EST

Page 11 - Wall Panel H Installation

Description Part Number Assembly Letter Quantity Required Tools Two Person AssemblyFloor Front Floor 5L01A1 Repeat Floor 5L11B1Walls Repea

Page 12 - 3-6_B AND 3-7_B

Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before b

Page 13

AB2.0 Floor InstallationAUsing a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).c.Drill pilot hole

Page 14

AB2.1 Floor InstallationConnect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA)9 places; keep panels aligned and even while ins

Page 15

3.1 Wall Panel D InstallationSnap Repeat Left Side (C) into the back position of Repeat Floor (B).b.CALIGNALIGNclickHold Repeat Left Side (C) upright

Page 16

12DCCOVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE 1/1DETAIL 3-3_BSCALE 1/1DETAIL 3-4_B AND 3-5_BSCALE 1/1DETAIL 3-6_B AND 3-7_BSC

Page 17 - Door Finishing Installation

Snap Repeat Right Side (E) into the back position ofRepeat Floor (B).b.Hold Repeat Right Side (E) upright to prevent it fromfalling (until Right Back

Page 18 - MAINTENANCE & SAFETY

Connect Right Back (F) onto dovetails of Repeat RightSide (E). Align the lap joint between Left Back (D) and Right Back (F).b.Engage snaps on bottom o

Commentaires sur ces manuels

Pas de commentaire