5L2076 ¾"51 ½"55 ¼"P0-5L20-P0Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Servi
Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.Note: This pilot hole is to be drilled thro
Snap Front Left Side (G) into Front Floor (A).d.21clickALIGNALIGNGInstall Wall Connector (Q) 5 places, connecting Repeat Left Side (C) and Front Left
Align the lap joint between Front Right Side (H) andRepeat Right Side (E).c.HDrill a pilot hole (using 1/8" drill bit) in front lower corner at l
4.0 Roof Panel M (back position) InstallationMRBInstall one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the
From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at e
4.2 Roof Panel J (front position) & Door InstallationInstall one Front Roof (J) onto front section: roof gable edge toward front of shed.Align to
From inside the shed, install four Screws (AA) into the roof, two on each side wall. Note: The screws also have to go through the Roof Brace (RB) at e
5.0 Finishing InstallationInstall Screws (AA) into 8 locations shown at bottom of wall panels to secure walls to floor. a.AA (8)HELPFUL HINT: Pilot
Printed in U.S.A.2010 Rubbermaid Incorporated, Huntersville, NC U.S.A. 28078-1801 Customer ServiceToll Free: 1-888-895-2110M–F 8:30 a.m. to 5 p.m. EST
Description Part Number Assembly Letter Quantity Required Tools Two Person AssemblyFloor Front Floor 5L01A1 Repeat Floor 5L11B1Walls Repea
Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before b
AB2.0 Floor InstallationAUsing a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).c.Drill pilot hole
AB2.1 Floor InstallationConnect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA)9 places; keep panels aligned and even while ins
3.1 Wall Panel D InstallationSnap Repeat Left Side (C) into the back position of Repeat Floor (B).b.CALIGNALIGNclickHold Repeat Left Side (C) upright
12DCCOVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE 1/1DETAIL 3-3_BSCALE 1/1DETAIL 3-4_B AND 3-5_BSCALE 1/1DETAIL 3-6_B AND 3-7_BSC
Snap Repeat Right Side (E) into the back position ofRepeat Floor (B).b.Hold Repeat Right Side (E) upright to prevent it fromfalling (until Right Back
Connect Right Back (F) onto dovetails of Repeat RightSide (E). Align the lap joint between Left Back (D) and Right Back (F).b.Engage snaps on bottom o
Commentaires sur ces manuels