Rubbermaid FG5L3000SDONX Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Non Rubbermaid FG5L3000SDONX. Rubbermaid FG5L3000SDONX Installation Guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 23
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides proper
drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important that the steps are followed in the correct order).
Review the parts list and make sure that no parts are missing.
IMPORTANT – DO NOT
RETURN TO THE STORE
For assistance with your Rubbermaid
Storage Building or for additional
product information call our toll-free
Consumer Service number:
1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
or visit us online at:
www.rubbermaid.com.
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
5L30
76 ¾"
75 ½"
55 ¼"
1780070
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.
Vue de la page 0
1 2 3 4 5 6 ... 22 23

Résumé du contenu

Page 1 - Installation Steps:

Congratulations and thank you for purchasing a Rubbermaid storage building.BEFORE YOU BEGIN – BUILDING CODESBe sure to check your local building codes

Page 2 - Two Person Assembly

Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). Position connectors in slots and slide down to snap in plac

Page 3 - Site Preparation

Snap middle position Repeat Left Side (C) into the middle position Repeat Floor (B).c.21clickAlign the lap joint between back position Repeat Left Sid

Page 4 - Floor Installation

Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.Note: This pilot hole is to be drilled thro

Page 5

Snap Front Left Side (G) into Front Floor (A).d.21clickALIGNALIGNG3.6 Wall Panel E (Repeat Right Side) InstallationInstall Wall Connector (Q) 5 place

Page 6 - Wall Panel C Installation

Align the lap joint between Repeat Right Side (E) andmiddle position Repeat Right Side (E).b.EOVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE

Page 7 - Wall Panel D Installation

3.7 Wall Panel H InstallationAlign the lap joint between Front Right Side (H) andmiddle position Repeat Right Side (E).c.HHHScrew HolesUsing a screwd

Page 8 - Wall Panel E Installation

Snap Front Right Side (H) into Front Floor (A).d.Install Wall Connector (Q) 5 places, connecting middlesection Repeat Right Side (E) and Front Right S

Page 9 - Wall Panel F Installation

Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown.Lower the roof onto the walls and align

Page 10 - Connectors

4.1 Roof Panel M (middle position) InstallationMRBInstall one Repeat Roof (M) onto middle section. The overlap edge of roof points toward the back of

Page 11 - 3-6_B AND 3-7_B

From inside the shed, install four Screws (AA) into the roof at each side wall location. Note: The screws also have to go through the Roof Brace (RB)

Page 12 - Wall Panel G Installation

Description Part Number Assembly Letter Quantity Required Tools Two Person AssemblyFloor Front Floor 5L01A1 Repeat Floor 5L11B2Walls Repea

Page 13 - Screw Holes

4.2 Roof Panel J (front position) & Door InstallationInstall one Front Roof (J) onto front section: roof gable edge toward front of shed.Align to

Page 14

From inside the shed, install four Screws (AA) into the roof at each side wall location. Note: The screws also have to go through the Roof Brace (RB)

Page 15 - Wall Panel H Installation

5.0 Finishing InstallationInstall Screws (AA) into 10 locations shown at bottom of wall panels to secure walls to floor. a.AA (10)HELPFUL HINT: Pilo

Page 16

5.1 Door Finishing InstallationInstall Lock Hasp (X) into opening on Right Door (K).a.Install Door Handle (T) onto Left Door (L) using fourScrews (AA

Page 17

Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before b

Page 18

ABB2.0 Floor InstallationAUsing a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).c.Drill pilot hol

Page 19

AB2.1 Floor InstallationConnect and align back position Repeat Floor (B) to middle position Repeat Floor (B) and install Screws (AA) 9 places; keep p

Page 20

3.0 Wall Panel C InstallationUsing a screwdriver, punch out the screw holes on the top of Repeat Left Side (C) 2 places.a.CSnap Repeat Left Side (C)

Page 21

OVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE 1/1DETAIL 3-3_BSCALE 1/1DETAIL 3-4_B AND 3-5_BSCALE 1/1DETAIL 3-6_B AND 3-7_BSCALE

Page 22 - Finishing Installation

3.2 Wall Panel E InstallationSnap Repeat Right Side (E) into the back position ofRepeat Floor (B).b.Hold Repeat Right Side (E) upright to prevent it

Page 23 - Door Finishing Installation

3.3 Wall Panel F InstallationConnect Right Back (F) onto dovetails of Repeat RightSide (E). Align the lap joint between Left Back (D) and Right Back

Commentaires sur ces manuels

Pas de commentaire